Designing and building a cleanroom requires meticulous attention to detail, experience and the ability to transform regulatory principles into practical, reliable construction solutions.
With its PST wall system and CIS ceiling system, Parteco has once again put its engineering approach and manufacturing capabilities to the test. Both systems underwent an extensive evaluation at the Fraunhofer IPA Institute in Stuttgart, one of the world’s most authoritative independent laboratories. The outcome confirmed their full suitability for the construction of cleanrooms up to ISO Class 2, with features suitable for pharmaceutical applications of GMP Class A/B.
Hygienic Design: the Parteco approach
At Parteco, Hygienic Design is not just a requirement, but a design philosophy. Every detail of the PST and CIS systems has been developed to ensure:
- Easy cleaning and disinfection
- Reduced risk of particle accumulation
- Maximum resistance to sanitization processes
Key design choices include:
- Aluminium profiles with rounded corners, eliminating sharp edges and dead zones
- Pharmaceutical-grade silicone seals, ensuring continuity between elements
- Removable gaskets and fastening systems to simplify thorough cleaning and maintenance
- Carefully selected materials – such as HPL, stainless steel 316L, safety glass, and anodized aluminium – all tested for durability against aggressive cleaning agents
Thanks to this design philosophy, Parteco cleanroom structures not only comply with EHEDG, ISO, and GMP standards, but are also built to withstand the demands of real-world operations.
Particle Emission Control: going beyond compliance
Another critical aspect in cleanroom performance is particle emission control. Parteco subjected its PST and CIS systems to stress tests simulating real operating conditions – including vibrations and oscillations typically generated by HVAC systems.
Thanks to a design that minimizes joints and maximizes flush surfaces, the tests confirmed: minimal particle emission, even under extended stress conditions demonstrating full compliance with ISO 14644-1 up to Class 2
This ensures that Parteco cleanrooms deliver superior performance even in the most sensitive production environments.
From validation to customer value
For Parteco, relying on independent validation is not a final milestone but a way to guarantee transparency and added value for our clients.
The results of the Fraunhofer IPA evaluation reinforce our design choices:
- Reducing contamination risks
- Facilitating everyday cleanroom management
- Ensuring compliance with the most stringent GMP and ISO requirements
Delivering pre-validated solutions that guarantee performance from day one
Why choose Parteco?
Choosing Parteco means choosing more than just cleanroom components. It means working with a partner who delivers tested and certified turnkey solutions, designed to ensure safety, efficiency, and long-term reliability in contamination-controlled environments.
With the PST and CIS systems, Parteco strengthens its role as a trusted partner in delivering high-performance cleanroom solutions for the pharmaceutical sector.